: Collect time-series load data from energy meters, supervisory control and data acquisition (SCADA) systems, or data loggers. Resolution should be at least 1-minute intervals, preferably 15- or 5-second intervals, to capture rapid changes.

The single greatest advantage of a proper MD calculation is capital expenditure (CAPEX) reduction. By applying diversity factors (e.g., not every power point will draw 10A at 5 PM), you can size a main switch for 400A instead of 800A. In one commercial tower review, an accurate MD saved $47,000 in cable and transformer costs. maximum demand calculation

The first critical nuance of MD calculation lies in the . Contrary to popular misconception, maximum demand does not refer to a fleeting, instantaneous surge of current (e.g., starting a large motor). Such transient spikes are typically handled by protective devices like circuit breakers, but they do not dictate long-term infrastructure loading. Instead, MD is measured over a continuous, sliding time window. : Collect time-series load data from energy meters,